Why permanent mould casting has its own constraints

In permanent mould casting the metal is poured into a reusable metal mould, by gravity or under low pressure. Compared with sand moulding the critical resources change: not flasks or sand, but moulds, machines or stations, operators and often heat treatment downstream. It is typical for aluminium and copper alloys, such as brass for taps and valves.

The challenges, one by one

Mould and machine

Each mould is tied to a compatible machine, station or carousel. There is often only one mould for the most requested items, and it becomes the critical resource.

Changeover, preheating and coating

Before producing good parts the mould has to be mounted, preheated and coated. The first castings after a change are often scrap. Runs that are too short multiply these times.

Alloy per machine in low pressure

A low pressure machine has a dedicated furnace underneath: the alloy is fixed in practice. Items have to be assigned to the machines with the right alloy.

Sand cores

Many permanent mould castings have cores produced in the core shop. If cores are missing the machine stops; if they arrive too early they age. The core shop programme must follow the mould programme.

Operators

In gravity casting with manual stations, capacity often depends on the people present more than on the machines. Shifts and absences change the plan from one day to the next.

Mould maintenance

Moulds wear and have to be maintained after a given number of pours or when quality deteriorates. A mould under maintenance blocks the item.

Batch heat treatment

Many aluminium castings need heat treatment with solution treatment, quench and ageing, as in T6. The furnace works in batches, with long cycles and limited capacity per load: it is often the real bottleneck, hidden downstream of the machines.

Downstream inspection

X-ray inspection, leak testing and machining complete the routing. Here too capacity has to be considered in the plan.

How it is usually planned

The shop supervisor decides which moulds to mount based on urgencies and the operators present. The core shop receives the programme verbally or on a sheet of paper, heat treatment is organised around the castings that arrive, and moulds are maintained when they start producing scrap.

The limits of spreadsheets and generic ERP systems

  • Moulds not managed as resources linked to the machines.
  • Low pressure alloy not considered when assigning items.
  • Cores disconnected from the mould plan.
  • Heat treatment ignored: castings pile up in front of the furnace.
  • Capacity in machines, not operators: the plan does not hold when staff are missing.
Fond/Wise

How FOND/WISE handles it

FOND/WISE manages permanent moulds and core boxes as tooling, with status, location, periodic maintenance and an alert when they are unavailable. For each item there are alloy, pouring temperatures, cores per casting, routings with internal and outside operations, labour and machine times and lead times, including heat treatment and outside processing. MRP calculates core requirements from the same orders, and progress comes in from the shop floor through the MES.

FIP’s AI production scheduling plans machines, moulds and furnaces with rules written in plain language, for example “mould 14 only runs on carousel 2”, “low pressure machine 3 is always in EN AC-42100” or “the solution treatment furnace does two 1,200 kg loads a day”. The plan shows the load on every resource, including downstream ones, and the reasons for delays.

Discover AI scheduling on FIP →

Key features

Moulds as tooling

Status, location, maintenance and unavailability alerts.

Mould and machine

Rules on which moulds run on which machines or stations.

Cores from MRP

Core requirements calculated from orders and the plan.

Operators and shifts

Casting station capacity tied to the people on shift.

Batch heat treatment

Loads and cycles of the solution treatment and ageing furnace in the plan.

Scenarios side by side

A mould under maintenance, an extra shift: plans compared.

Request a demo → Discover the Fond/Wise foundry ERP

Worked example

An aluminium foundry has two gravity carousels, one low pressure machine and a heat treatment furnace that runs two 1,200 kg loads a day, with a solution treatment, quench and ageing cycle. Illustrative values.

Item Process Possible pieces/day Weight Heat treatment
Valve body gravity 600 2.0 kg yes
Wheel low pressure 250 9.0 kg yes
Cover gravity 800 1.2 kg no

If the machines run flat out, 3,450 kg of castings reach heat treatment every day (600 × 2.0 + 250 × 9.0), against a capacity of 2,400 kg. In a week more than 5 tonnes of castings pile up waiting for treatment, and deliveries do not improve.

The right plan starts from the heat treatment furnace: load the furnace fully with the mix of castings that deliveries require, and use the carousels’ spare capacity for the cover, which needs no treatment.

Frequently asked questions

What is the difference between gravity and low pressure permanent mould casting?

In both cases the metal is cast into a metal mould, the permanent mould. In gravity casting the metal flows in under its own weight, often with manual pouring or on a carousel. In low pressure casting the metal rises into the mould from a furnace below, pushed by moderate pressure: the machine has a dedicated furnace and therefore a fixed alloy.

Why is a mould change critical?

Because the mould has to be mounted, preheated and often coated before it produces good parts. The first castings after the change are often scrap. Grouping production by mould reduces these times.

How do cores affect permanent mould casting?

Many permanent mould castings have sand cores, produced in the core shop with shell or cold box processes. If the cores are not ready, the machine stops: the core shop programme must follow the mould programme.

Why is heat treatment often the bottleneck?

Because it works in batches, with long solution treatment, quench and ageing cycles, and limited capacity per load. If the plan does not take it into account, castings pile up in front of the furnace.

Does capacity depend on machines or on operators?

In gravity casting with manual stations it often depends on operators: a carousel may have more stations than there are people available on that shift. The plan has to consider who is present, not just the machines.