AI production scheduling for foundries
A feasible moulding and pouring plan in minutes, with furnace, alloy, pattern and flask constraints described in plain words.
FIP’s AI scheduling, part of the Fond/Wise world
FIP (Foundry Intelligence Platform) schedules production from moulding to pouring with an optimisation engine. Your foundry’s rules are described in natural language, with no configuration screens, and in minutes the planner has a feasible multi-week plan with delays, unscheduled items and bottlenecks already flagged.
- A plan for at least 4 weeks, in minutes
- Constraints in plain words, no forms
- Moulding, furnaces, alloys, patterns and flasks
- Delays and bottlenecks explained
- “What if…” scenarios compared with the plan
- Decisions stay with the planner
Scheduling a foundry is one of the hardest scheduling problems in manufacturing. Moulding and pouring are linked, a furnace cannot pour below a minimum load, different alloys cannot share a heat, patterns are shared between items and flasks only become free again after shakeout. A spreadsheet or a generic scheduling tool cannot handle all of these rules together.
FIP’s AI scheduling builds the production plan around the foundry’s real constraints. The planner describes the rules in plain words, such as “the moulding line makes at most 180 flasks a day” or “furnace 1 does not pour below 900 kg”, and within minutes gets a feasible plan covering at least four weeks, which can be changed and recalculated whenever something changes.
Decisions stay with people: FIP proposes a realistic plan and explains why an order is late or an item was not scheduled; the planner reviews it, adjusts it and confirms it.
Key features
Rules in plain words
Foundry constraints are described in natural language, with no configuration screens. Key rules are saved and shared by all planners.
Moulding and pouring together
Flasks per day, stations, coupled moulding and pouring lines, maximum time between moulding and pouring.
Furnaces and alloys
Number and capacity of furnaces, kg per heat, heats per day, minimum load per heat, no mixed alloys in the same heat.
Patterns and flasks
Patterns as resources shared between items; flasks limited and occupied until shakeout.
People and shifts
Labour and machine time, crews and shifts (for example plant running 6:00–19:00).
Multi-week plan
At least four weeks, including orders already late, with weekly or daily rescheduling.
Delays explained
Orders at risk and unscheduled items, each with its reason.
“What if…” scenarios
A furnace down, a Saturday heat, a customer priority: an alternative plan compared with the main one, differences highlighted.
Why foundry scheduling is different
In a machine shop, scheduling assigns operations to machines. In a foundry every decision constrains others, often in different departments:
- moulding and pouring are coupled: a moulded flask must be poured within a maximum time, and the pouring line follows the pace of moulding;
- furnaces have a minimum load: you do not start a heat for a few kilos, so items must be grouped;
- alloys cannot be mixed: items in different alloys cannot share a heat, and every alloy change costs time and energy;
- patterns are shared: the same pattern or plate may serve several items, and cannot be in two places at once;
- flasks are limited: they stay occupied until shakeout, or for a number of days after pouring;
- shifts and crews change real capacity from one day to the next.
That is why foundry production scheduling is often done on a whiteboard or in a spreadsheet, with the planner’s experience as the only calculation engine. It works until something changes: a rush order, a furnace down, a pattern under maintenance.
Every production type has its own challenges
Scheduling changes a lot from one process to another. Each one has its own page.
| Process | Critical resource | Main challenges |
|---|---|---|
| Automatic moulding line | The line, at a fixed rate | Plate changes, pairing 50% half-plate patterns in the same alloy, continuous pouring, cooling, cores |
| Hand moulding and large castings | Floor space, large flasks, crews | Long mould times, castings that take a full furnace, days of cooling, customer patterns |
| High pressure die casting | Machines and dies | Die-machine compatibility, die changes, die life, alloy per cell, downstream operations |
| Permanent mould casting | Dies, machines, operators | Die preheating and changes, cores, low-pressure alloy, batch heat treatment |
| Investment casting | Ceramic shell and drying | Tree composition, fixed times between coats, long lead times, late-detected scrap |
Planning and scheduling: two levels working together
| Production planning (Fond/Wise) | AI scheduling (FIP) | |
|---|---|---|
| Question | What to produce, and how much, to meet orders? | On which day, on which line, in which heat? |
| Tools | Master schedule (MPS), requirements (MRP), work-centre loads | Optimisation engine with the foundry’s real constraints |
| Horizon | Weeks and months | At least four weeks, rescheduled weekly or daily |
| Result | Moulding, core, alloy and material requirements | Feasible daily moulding and pouring plan, with delays and bottlenecks explained |
Fond/Wise holds the data needed to schedule well: customer orders and due dates, pattern data (cavities per pattern, plate, gross weight, alloy, pouring temperatures), daily plant capacity in flasks, gross kg and times, and real progress from the shop floor. FIP uses this data to calculate the best sequence. For the technical details of the ERP integration, see FIP’s ERP integration page.
The constraints the scheduler handles
| Resource | Constraints | Example in plain words |
|---|---|---|
| Moulding | Flasks per day, stations, lines coupled with pouring, plate changes, pairing of half plates | “The moulding line makes at most 180 flasks a day” |
| Furnaces | Number, capacity, kg per heat, heats per day, minimum load | “Furnace 1 does not pour below 900 kg” |
| Alloys | One alloy per heat | “Do not mix ductile and grey iron in the same heat” |
| Patterns | Resources shared between items | “The flange pattern also serves the cover” |
| Flasks | Limited number, occupied until shakeout | “Large flasks are free two days after pouring” |
| People and shifts | Labour and machine time, crews, hours | “The plant runs from 6:00 to 19:00” |
| Time between steps | Maximum time between moulding and pouring | “Flasks must be poured by the next day” |
Key rules are saved and reused by all planners, so the foundry’s know-how does not stay in one person’s head.
How it works, step by step
- Describe the foundry’s constraints in natural language, once.
- Load the orders, including those already late.
- FIP calculates the plan for at least four weeks, in minutes.
- The planner reads the result: daily moulded and poured quantities, saturation of moulding, furnaces and flasks, orders at risk with the reason, unscheduled items with the reason.
- Ask for changes in plain words: “furnace 2 is down on Tuesday”, “prioritise customer X”, “add a Saturday shift”.
- FIP recalculates and shows the new plan next to the main one, with the differences highlighted.
- The planner confirms the plan and reschedules weekly or daily as needed.
Example: a furnace down mid-week
An iron foundry has a moulding line making 180 flasks a day, two furnaces and a 6:00–19:00 shift. On Monday morning the plan for the next four weeks is ready. At 10:00 news arrives: furnace 1 will be down on Wednesday for maintenance. Illustrative example.
- Without scheduling: the planner goes back to the whiteboard, moves Wednesday’s heats by hand, checks patterns and flasks, phones the shop floor. By the end of the day there is a new plan, but no certainty about which deliveries are at risk.
- With AI scheduling: the planner types “furnace 1 is down on Wednesday”. Within minutes there is an alternative scenario next to the main plan. Two orders slip by a day, each with its reason, and furnace 2 reaches its limit on Thursday. The planner tries a scenario with an extra Saturday heat, compares the two plans and chooses.
The decision is always the planner’s. The difference is that it takes minutes, with every consequence in view.
The limits of spreadsheets and generic scheduling software
- Spreadsheets and whiteboards: the plan depends on one person, is rebuilt by hand at every disruption and does not show delays and bottlenecks in advance.
- Generic schedulers (APS): designed for machine shops, they handle typical foundry constraints poorly, such as coupled moulding and pouring, minimum furnace load, alloys that cannot be mixed and flasks occupied until shakeout.
- Rigid configuration: every new rule needs a consultant and weeks of setup, instead of a sentence.
- No scenarios: you cannot ask “what happens if…” and compare two plans before deciding.
Related articles
Automatic moulding line scheduling: pattern plates, half plates, pouring and cooling
How to schedule an automatic moulding line: pattern plate changes, pairing of half plates, continuous pouring, cooling, cores and green sand.
Read the guide →Hand moulding and large castings scheduling: floor space, flasks, heats and cooling
How to schedule hand moulding of large castings: floor space, large flasks, moulding teams, furnace capacity, in-mould cooling and later steps.
Read the guide →Die casting production scheduling: machines, dies, alloys and downstream steps
How to schedule high pressure die casting: die and machine compatibility, die changes, die life and maintenance, alloy per cell and downstream bottlenecks.
Read the guide →Permanent mould casting scheduling: moulds, machines, cores and heat treatment
How to schedule gravity and low pressure permanent mould casting: moulds and machines, preheating, cores, operators and batch heat treatment such as T6.
Read the guide →Investment casting scheduling: wax trees, ceramic shell, drying and pouring
How to schedule lost wax investment casting: wax injection dies, tree assembly, ceramic shell drying, pouring by alloy and scrap that is found late.
Read the guide →How to choose ERP software for a foundry
The criteria for choosing a foundry ERP: process coverage, traceability, scheduling, costing, shop-floor integration, cloud options and supplier expertise.
Read the guide →Frequently asked questions
What is foundry production scheduling?
It is the calculation of the detailed production plan: which items to mould and pour, on which day, on which line and in which heat, respecting moulding, furnace, alloy, pattern, flask and shift capacity. It is the level that follows production planning (MPS and MRP), which decides what to produce and how much.
What is the difference between production planning and scheduling?
Planning decides what to produce and when it is needed, starting from orders and requirements. Scheduling turns the plan into a feasible day-by-day sequence on real resources, at finite capacity. In Fond/Wise, planning uses MPS and MRP; AI scheduling is handled by FIP.
Do I have to configure constraints in a form?
No. Constraints are described in natural language, for example “the moulding line makes at most 180 flasks a day”, and FIP translates them into scheduling rules. Key rules are saved and used by all planners.
Does AI replace the planner?
No. FIP provides a feasible plan in minutes and flags critical points, but decisions stay with people: the planner adjusts the plan, asks for alternative scenarios and confirms.
Does it work for any type of foundry?
Yes: it adapts to automatic moulding lines, hand moulding and large castings, high pressure die casting, permanent mould casting and investment casting, with one or more furnaces and with ferrous and non-ferrous alloys. Each process has its own constraints, described in plain words.
What horizon does it plan?
The plan covers at least four weeks, including orders already late, and is rescheduled weekly or daily when orders, priorities or resource availability change.
How do we get started?
With a pilot project on your foundry’s real data, with measurable goals. Details are on FIP’s AI production scheduling page.
Related modules
Production planning
Scheduling of moulding, pouring, cores and finishing against the real capacity of lines, furnaces and flasks.
Learn more →MES & production tracking
Open and close orders on the shop floor, times, quantities, scrap and operator notes.
Learn more →Alloys & chemical analysis
Components, chemical elements, melting loss, price trends and analyses imported from the spectrometer.
Learn more →Want to see Fond/Wise running on your foundry’s data?
Book a demo with the RC Informatica team — foundry software specialists since 1994.